Natural Power carry out detailed desk based and on-site investigations to determine the feasibility of public access for large scale wind turbine components and other associated abnormal loads. Factors considered include:
Software tools for Swept Path Analysis such as AutoTrack and consultations with relevant local authorities are also carried out to highlight any issues and further determine the viability of proposed access routes.
Establishing and resolving access constraints through detailed investigations are vital during the development of a wind farm as failure to consult with relevant local organisations or ascertain the required upgrades can result in project delays and increased project costs.