Reproduced from the Ordnance Survey data with the permission of HM Stationary Office. (Lic No. AL 100020693)
We have developed a thorough and successful project design and optimisation process that ensures all projects strike an appropriate balance between optimal energy production and sensitive site design.
Our renewable energy projects such as the award winning 50 MW Crystal Rig 1 site in the Scottish Borders all follow this process. The balance of technical and environmental considerations allows us to deliver projects to our clients which are optimised in terms of economic return, technical feasibility and in the probability of acquiring environmental approval and building consents.