5 Aug 2020 .

Solar acceptance testing in the time of Covid-19

Once installed, a solar farm needs to undergo rigorous testing, independent inspection and performance verification. This demonstrates that the construction contractor has fulfilled their obligations, and it allows the owner to officially accept the site. But what happens when a global pandemic causes a country to enter lockdown and prevents independent engineers from physically going to a site? 

Download the white paper here to find out more.